Completed
We can confirm that BGP was restored and have started to see traffic return on on Linx Lon1.
Posted Jul 06, 2022 - 16:05 BST
Update
Fibre now moved over and we are about to bring BGP backup for Linx Lon1.
Posted Jul 06, 2022 - 15:39 BST
Update
BGP is now shutdown.
Posted Jul 06, 2022 - 15:27 BST
Update
We can confirm BGP is about to shutdown.
Posted Jul 06, 2022 - 15:07 BST
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Jul 06, 2022 - 14:16 BST
Scheduled
We will soon be shutting down Linx Lon1 connection as we urgently need to move the port to a new fibre.

We will gracefully shutdown BGP Peering sessions so traffic routes via another network route and once traffic as moved away, we will then shutdown the port and change the fibre over before bringing up the BGP Peering sessions again. This should hopefully not be service affecting due to us shutting down BGP before work is started.

The actual downtime of this route should not be for long. however we have set a 4 hour window for when the work is likely to start and complete. if the work is completed early, then we will update to confirm this. We will provide more updates ASAP.